SimPlan Logo
Instant Contact:
+49 6181 40296-0
info@simplan.de
SimPlan Logo weiß
  • Home
  • Services
    • Overview Services
    • Distribution Logistics
    • Production logistics in the process simulation
    • Production processes
    • Transparency with Supply Chain Simulation (SCM)
    • Process simulation in the health care sector: hospital simulation
    • Implementation of simulation tools
    • More services
  • Software
    • Software overview
    • AnyLogic
    • anyLogistix
    • AutoMod
    • Emulate3D
    • PacSi
    • Plant Simulation
    • Simio
    • SimAssist
    • SimVSM
    • Supply Chain Suite (SCS) – Software for Supply Chain Management
    • Building block libraries in the simulation
  • Trainings
    • All Trainings
    • Webseminars
  • References
    • Case studies
    • Customer opinions about projects and trainings
  • News
    • News
    • Newsletter
  • Knowledge
    • SimBlog
    • Videos
    • FAQ
    • SimPlan Books
    • Publications
    • Downloads
  • Research
  • About
    • 30 years of SimPlan
    • Meet our Management
    • Our Corporate Philosophy
    • Company History & Facts
    • Locations
    • SimPlan Certification
  • Career
  • Contact
    • Sales team: We are your contact persons
globe
  • Deutsch
  • English

Simulation Software Dispo-Tool

Home
Software for simulation
Simulation Software Dispo-Tool

Simulation Software Dispo-Tool

Home
Software for simulation
Simulation Software Dispo-Tool

Dispo-Tool

Dispo-Tool

Optimising the logistics control station

Besides high plant output, the main aim of efficient plant scheduling is an even capacity utilisation of picking areas and packing departments. Furthermore, when developing a high-capacity order-picking strategy the focus is on short throughput times and keeping consignment parts together whilst maintaining high flexibility.

Using the consignment date as the fundamental criterion for prioritising picking orders generally does not yield consistent plant capacity utilisation. Optimal utilisation of plant and personnel can only be achieved if all plant areas involved with an order are taken into account when determining the order sequence.

The Dispo-Tool in the plant control station incorporates the areas from order commencement through picking areas, consolidation to packing and consignment whilst at the same time keeping orders together and adhering to specific departure times.

By generating a simulation model and subsequently carrying out experiments with existing WMS data, the parameters for the configuration of the dispo tool can be ascertained and the optimisation potential determined. As a side effect weak points and bottlenecks are uncovered, which otherwise only come to light in the course of long-winded and costly experiments.

Features of the Dispo-Tool

  • Transfer the picking orders (trays) to the dispo tool after they have been cleared by the host and allocated in the existing WMS
  • Suggest personnel allocation based on the known orders
  • Calculate a favourable tray starting sequence and
  • Send it back to the WMS from the dispo tool.

Functions of the Dispo-Tool

  • Presentation and analysis of the job load to be scheduled
  • Personnel scheduling (automatic and manual)
  • Evaluation of bottleneck areas
  • Development of a daily capacity profile
  • Order scheduling / scheduling run
  • Division of consignments into batches
  • User interfaces for execution of SQL instructions
  • Simulation link
  • Projection of capacity utilisation, operating time, throughput time, buffer capacity levels etc.
  • Control station response, rejection of the old scheduling and rescheduling subject to parameter Variation

Aims and benefits

  • Even plant and personnel capacity utilisation
  • Shorter consignment throughput times as the consignment parts are kept together
  • No overrun of consolidation and packing areas
  • Flexibility remains guaranteed – special actions possible at any time

More information and downloads

  • Flyer Dispo-Tool

See for yourself how effective our solutions are!

Contact us now!

Trainings

12.05. AnyLogic Short

14.05. Plant Simulation Short

19. – 20.05 Plant Simulation Coaching

Dates

  • SimAssist User Meeting – 13th May 2025, Regensburg
  • Transport Logistic – 2nd – 5th June 2025, Munich
  • Plant User Meeting – 30.06. – 02.07.2025, Amsterdam
  • ASIM 2025 – 24th – 26th September 2025, Dresden
  • Leanbase: Data, Power, Production – 20-21 May 2025, Mannheim

Downloads

In our download area you will find software information, application areas and case studies.

Newsletter

Register now for our newsletter.

Recent Posts

  • Process mining – making processes visible and exploiting potential for improvement
  • Detailed planning of production
  • Project support: We support you with your simulation topics
SimPlan_Refresh_Icon-white_EN

SimPlan AG

Sophie-Scholl-Platz 6
63452 Hanau

Registry Court: Amtsgericht Hanau
Registration number: HRB 6845

Contact

+49 6181 40296-0

info@simplan.de

Newsletter


    Our Channels

    © 2025 SimPlan AG – All rights reserved

    • Home
    • Imprint
    • Compliance
    • Privacy Policy
    • Contact