Portfolio: Beverage Industry

Beverage Industry

Safeguarding supplier planning: identifying and eliminating bottlenecks.
Development of a control system for a color sorting store.

  • Simulation of filling and packaging lines as well as palletizing.
  • Identification of existing bottlenecks and development of appropriate measures to eliminate bottlenecks
  • Optimization of order sequence and product mix
  • Plant simulation 10.1 – 13.0
  • Development of a library for the simulation of bottling plants
  • Use of LogisticSuite for the simulation of pallet conveyor technology
  • Automatic interface for input data
  • Elimination of bottling line blockages
  • Increase in palletizing capacity through restructuring of pallet conveyor technology and optimization of control logic and order mix

Other projects

Fallstudie Anlagenbau Rehau - SimPlan AG

REHAU AG + Co: Simulation high bay warehouse

Fallstudie Automobilzulieferer

Simulation of a housing machining

Simulationsprojekt für Hay - SimPlan AG

Johann Hay GmbH & Co. KG: simulation of new facility

Chassis of the electric, hybrid car with powertrain. Car maintenance. Blue toned.

Case study FTS simulation

Motorradreifen

Automation of the quality inspection of motorcycle tires