REHAU AG + Co: Simulation high bay warehouse

SimPlan simulates high-bay warehouse for REHAU

REHAU AG + Co is an international leader as a premium brand for polymer-based solutions in the construction, automotive and industrial sectors. At the Feuchtwangen site, Rehau invested 25 million euros in a new high-bay warehouse with optimized material flow. After a construction period of 13 months, series operation started at the beginning of the year.

The new material flow system connects the 12-aisle high-bay warehouse with the injection molding, painting and assembly areas. Internal transport is provided by electric monorail trolleys running on a rail system on the ceiling of the plant halls.

The control of the highly dynamic and complex intralogistics system takes into account not only the complete warehouse management, but also the management and scheduling of the electric monorail trolleys and the load carriers.

Parallel to the planning of the material flow concept, SimPlan AG created a simulation model with the aim of validating the system and testing and optimizing the control strategies on the virtual model before implementation.

Other Projects

Emmerthaler Fallstudie

Factory planning at Emmerthaler: Simulation in medium-sized companies

Foto Lufthansa Cargo Beladung

Lufthansa Cargo: Restructuring of a cargo terminal

Bayer_Modellayout_Formulierlinie

Bayer – Virtual Factory @ Crop Science

Enterprise_Dynamics-1024x446

HANS LINGL ANLAGENBAU: simulation of new facility

Simulationsprojekt für Hugo Boss - SimPlan AG

Hugo Boss AG: simulation distribution centre