Project Report Airport – New Catering Centre Zurich

Simulation Catering Flughafen

Project report airport catering

Industry: Airport

Software: Plant Simulation

  • Illustration of the complete catering centre with new shuttle technology
  • Buffer and shuttle dimensioning
  • Determination of lorry requirements
  • Review and optimisation of process strategies
  • Determination of the required production capacities
  • Loading the current flight plans and equipment quantities
  • Implementation of the new shuttle technology
  • Mapping of the complete equipment handling process
  • Testing different flowlines
  • Safeguarding the new shuttle concept
  • Specifications for the production working time model
  • Specifications for lorry requirements

Other Projects

AdobeStock_246772962_Pharma

Simulation of a pharmaceutical system

b+m surface-systems Lackieranlage - SimPlan AG

b+m surface systems GmbH: Digital factory

Projektbericht Garant Materialfluss - SimPlan AG

Garant pet food GmbH – GMO-free production

Autositze

Simulation rear seat production

Production optimization with a digital twin at RUAG

RUAG: From the manufactory to batch production