Simulation rear seat production

Simulation rear seat production

 

  • Creation of a “prototype” model for rear seat bench manufacturing.
  • Training of the customer in Simul8
  • Validation of the planning
  • Validation of input data
  • Creation of a pilot project
  • Software: Simul8 2014 incl. user-defined menu for data management and results overview.
  • Module for mapping the production station with setup according to the last part of a batch
  • Identification of bottleneck facilities
  • Comparison of planned throughput with simulation results, or designation of OEE.

Other projects

interior front seat of vehicle car automobile

Assembly of interior door panels

Motorradreifen

Automation of the quality inspection of motorcycle tires

Power & Free Conveyor Technology

Fallstudie Automobilzulieferer

Simulation of a housing machining

Simulationsprojekt für Hay - SimPlan AG

Johann Hay GmbH & Co. KG: simulation of new facility