Project Report Airport – New Catering Centre Zurich

Simulation Catering Flughafen

Project report airport catering

Industry: Airport

Software: Plant Simulation

  • Illustration of the complete catering centre with new shuttle technology
  • Buffer and shuttle dimensioning
  • Determination of lorry requirements
  • Review and optimisation of process strategies
  • Determination of the required production capacities
  • Loading the current flight plans and equipment quantities
  • Implementation of the new shuttle technology
  • Mapping of the complete equipment handling process
  • Testing different flowlines
  • Safeguarding the new shuttle concept
  • Specifications for the production working time model
  • Specifications for lorry requirements

Other Projects

Module production plant_model

Reis Robotics GmbH: simulation module production plant

Demo3D Simulationssoftware, Simulations-Software oder Simulation Software

Klug GmbH integrierte Systeme: simulation as sales support

Krankenhaussimulation

Dashboard simulation – simulation model for a central emergency department (CED) and an elective center

Projektbericht Garant Materialfluss - SimPlan AG

Garant pet food GmbH – GMO-free production

Motorradreifen

Automation of the quality inspection of motorcycle tires